Here we are at the end of week 9 at the extension in Washingborough, the roofs are cut on ready to be tiled, now on with the existing roof.
Take a look at the progress of this extension Week 1, and Week3
Here we are at the end of week 9 at the extension in Washingborough, the roofs are cut on ready to be tiled, now on with the existing roof.
Take a look at the progress of this extension Week 1, and Week3