Single Storey Extension | Glass roof
Completed Pictures of a Cedar cladded Single Storey extension in Waddington we completed recently
Completed Pictures of a Cedar cladded Single Storey extension in Waddington we completed recently
This is a small extension we built in Lincoln but made a huge difference to the property, we filled in a corner by installing a GRP roof with a lantern by Advanced flat roofing. We removed the kitchen wall into the new extension fitting a new kitchen with a downstairs toilet with a utility area…
Here we have the final days’ pictures and the completed pictures for a two-storey extension in Waddington. Check the progress here
Here we are at the end of week two on an extension in Waddington, this one is a little more unusual as it’s going to be cedar cladding with a large roof light and living grass roof. Due to unstable ground, we’ve had to build this one on a raft suitable for the ground conditions. I’ll…
Here we are at the end of week one on a two-storey extension in Waddington, we’ve installed the block and beam floor and are ready for the brickwork, I’ll post more pictures as the project progresses.
Here we are in Lincoln adding more space to a property. We removed an old lean-to structure and added brickwork to form a more suitable living space. We removed the existing external load-bearing wall and added a steel beam support, we also added two Velux windows for more light. We left it for the customer…
Here we are at the end of week 9 at the extension in Washingborough, the roofs are cut on ready to be tiled, now on with the existing roof. Take a look at the progress of this extension Week 1, and Week3
Here we are removing a load-bearing wall on a property in Saxilby Lincoln, our client wanted to open up an existing dining room into a small lean too extension to make a large open plan kitchen diner.
Here we are at the end of week 7 on the extension in Washingborough. All the brick and block work up and steel frames installed ready for the roofs, we will post more pictures as the project progresses See the progress from Week 1, Week 3 and Week 5
Here we are at the end of week 5 on the extension in Washingborough, the drains, foundations, steel wind posts and block and beam floor are now installed Take a look at Week 1 and Week 3