Structural Work | North Hykeham
Here we are at another structural job in North Hykeham. Here we are removing a load-bearing wall to open up a small dark kitchen into the dining room creating a large open plan space.
Here we are at another structural job in North Hykeham. Here we are removing a load-bearing wall to open up a small dark kitchen into the dining room creating a large open plan space.
Here we are at the end of week 7 on the extension in Washingborough. All the brick and block work up and steel frames installed ready for the roofs, we will post more pictures as the project progresses See the progress from Week 1, Week 3 and Week 5
Here we are at the end of week 5 on the extension in Washingborough, the drains, foundations, steel wind posts and block and beam floor are now installed Take a look at Week 1 and Week 3