Extension Washingborough | Week 5
Here we are at the end of week 5 on the extension in Washingborough, the drains, foundations, steel wind posts and block and beam floor are now installed Take a look at Week 1 and Week 3
Here we are at the end of week 5 on the extension in Washingborough, the drains, foundations, steel wind posts and block and beam floor are now installed Take a look at Week 1 and Week 3